building elevationMeat Processing Center
  • Facility will house limited meat and poultry harvest operations, processing and packaging of products, a test kitchen, ready-to-eat operations, a retail sales office and a conference/training room. Approximately 14,500 gross square feet.
  • Located northwest of the Poultry Science Instructional Center along Stenner Creek Road.
  • Project is 100% Donor Funded; cost estimate is approximately $5,000,000.
  • Construction is expected to begin in Spring 2010.

photo of UU Plaza renovation UU Plaza Renovation CLICK HERE FOR LOCATION ON CAMPUS

  • The renovation includes new hardscape, landscape and the construction of a new stage.
  • Currently in design development with OMNI Design Group.
  • Projected construction beginning mid-June 2009.
  • Construction completion is anticipated to be Winter 2010.
  • Total project budget $4,478,000.
  • Click for more information: http://www.asi.calpoly.edu/uu_plaza_project
Simpson Strong-Tie CLICK HERE FOR LOCATION ON CAMPUS
  • The project will provide a Materials Demonstration Laboratory for the College of Architecture and Environmental Design, Construction Management department.
  • Currently in design with projected construction beginning Spring of 2009.
  • Total project budget is $2,999,000.
Anderson Pool Replacement CLICK HERE FOR LOCATION ON CAMPUS
  • The project involves replacement of the existing pool with a new stainless steel pool with 19 lanes 25 yards in length and 8 lanes 50 meters in length. Project also includes a new 15 foot by 30 foot therapy pool.
  • Construction phase is from October 2008 thru April 2009.
  • Total project budget is $3,071,000.
Center for Science CLICK HERE FOR LOCATION ON CAMPUS
  • The project involves replacement of Cal Poly’s Science building (#52) with a building that is conducive to modern needs. The project will provide 185,800 square feet including lecture space, laboratory space and faculty offices for the College of Science and Math.
  • Currently in design with projected construction beginning Spring 2009.
  • Projected budget is $124,000,000.
    *** Project is delayed due to California budget crisis.***
Technology Park CLICK HERE FOR LOCATION ON CAMPUS
  • The project will provide 20,000 square feet of research space available for lease.
  • Currently in design with actual construction beginning January 2009.
  • Total project budget is $5,700,000.
image of Recreation Center Recreation Center Expansion CLICK HERE FOR LOCATION ON CAMPUS
Construction Innovation Center
  • The project included a new building with approximately 46,000 square feet and 165,000 square feet of renovation for the College of Architecture and Environmental Design.
  • Construction was completed September 22, 2008.
  • Total project budget $25,441,053

    Construction Photos
Bella Montana Faculty/Staff Housing
Bonderson Projects Center
  • The Projects Center is a new facility for senior projects and other related activities. In 2001, Paul R. Bonderson Jr. and Sandra K. Bonderson established the Bonderson Excellence in Engineering Gift Fund for Projects. The fund benefits the College of Engineering and Computer Science Laboratory Renovation and Upgrade
  • Projected Completion Date: Fall, 2006
  • Construction Start Date: Spring, 2005

    Construction Photos
    Completed Photo Gallery
Engineering IV
  • The project will provide an additional 101,000 square feet for the College of Engineering
  • The project began construction in February, 2005
  • Total project budget $32,786,946
  • Completion scheduled: Early Winter, 2007

    Construction photos
    Completed Photo Gallery
Housing Administration
  • The project replaces the existing Housing Adminstration building with a new building.
  • New building: 8,300 sf
  • Construction start date: May, 2006
  • Total project budget: $3,748,985
  • Completion scheduled: Spring, 2007

    Construction photos
    Completed Photo Gallery
Marine Science Research Center
  • The project will provide a seawater pumping and filtration system enclosed in a new 1600 sq ft building
  • Construction start date: April, 2006
  • Total project budget: $2,080,895
  • Completion date scheduled: Early winter, 2006

    Construction photos
    Completed Photo Gallery
Alex G. Spanos Stadium
Building Elevations

California Polytechnic State University, San Luis Obispo, CA 93407
Facility Services 805/756-2321
Facilities Planning and Capital Projects 805/756-2581
Webmaster: Rex Wolf
Web Maintained by: Pamela Eidelman
Last Updated: November 5, 2009