Alex. G. Spanos Stadium
Projected Completion Date: Summer, 2006
Description: Phase I - West Side Bleachers and Memorial Plaza
The project includes over 3600 seats, realignment of California Blvd. (completed spring, 2005) permanent restrooms and a memorial plaza at the southeast corner of the stadium.
Architect/Engineer: RRM DEsign Group, San Luis Obispo
General Contractor: Maino Construction Co., Inc.
San Luis Obispo |
|
|
|
Bonderson Projects Center
Projected Completion Date: Summer, 2006
Construction Start Date: Spring, 2005
Square Feet: 21,000
Stories: 1 1/2
Description: In 2001, Paul R. Bonderson Jr. and Sandra K. Bonderson established the Bonderson Excellence in Engineering Gift Fund for Projects. The fund benefits the College of Engineering and Computer Science Laboratory Renovation and Upgrade. The Projects Center is a new facility for senior projects and other related activities. The building is located directly to the east of the Advanced Technology Laboratories building.
Architect: John Trautmann, Santa Monica
General Contractor: Main Construction Co., Inc., San Luis Obispo |
EDES South and Renovation
Projected Completion Date: Winter, 2008
Construction Start Date: Winter, 2006
The project includes a new building for the College of Architecture and Environmental Design, housing Construction Management and Architecture. It will include additional lecture space and renovations for several buildings.
Architect: Austin Veum Robbins Partners (AVRP)
San Diego
|
|
|
Engineering IV
Projected Completion Date: Winter, 2007
Construction Start Date: March, 2005
Square Feet: 104,000
Stories: 3
Description: (JCA) College of Engineering (CENG)
The project will provide a new building for CENG that includes Aerospace Engineering, Mechanical Engineering and Industrial and Manufacturing Engineering.
Architect: AC Martin Partners, Inc. Los Angeles
CM at Risk: Gilbane Building Co., Phoenix, Arizona
|
Poly Canyon Village
Projected Completion Dates:
Phase 1 - Summer, 2008
Phase 2 - Summer, 2009
Construction Start Date: Fall, 2005
Description: Apartments to accommodate nearly 27-- students, located on 27 acres on the northeast side of campus. The complex will have 619 units and 1900 parking spaces, study areas, laundry units, retail space and swimming pool.
Program Manager: Brookwood Program Management.
Atlanta, Georgia
Design-Build Contractor: Clark Design Build of California, Oakland
Architect: Niles Bolton, Atlanta, Georgia
|
|
|
Housing Administration Building
Projected Completion Date: Spring, 2007
Construction Start Date: December, 2005
Square Feet: 8300
Description: Replacement of the existing Housing Administration building with a a new, larger building. The new building will accommodate operations serving the increasing on-campus student population provided by the Cerro Vista Student Housing and future Poly Canyon Village residential complexes.
Architect/Engineer: RL Binder FAIA Architecture and Planning,
Playa del Rey |
|
|
|